Contact      FAQ      Sitemap
歡迎: [ 登陸賬號 ][ 注冊 ]
首頁      題庫分類      Demo

Index >> IBM >> System Administator >> "000-062 Exam"

000-062 Exam Features

IBM System p5 Virtualization Technical Support

killtest

IBM System p5 Virtualization Technical Support
考試編號 Q&A 更新 價格(美元)
000-062 Exam 67 Q&As 2008-09-01 $ 70
其他付款方式

System Administator 000-062 考試題庫

System Administator 000-062 考試題庫由我們的資深IT認證講師及產品專家精心打造,包括了當前最新的全套全真000-062考試試題,全部附有正確答案。所有購買本站認證考題的客戶都將得到60天的免費升級服務,保證了對IBM System p5 Virtualization Technical Support考試題庫的完整覆蓋。 助妳壹次通過 IBM System p5 Virtualization Technical Support 認證考試,壹次不過全額退款!

1、000-062 Exam試題都是考試原題的完美組合,覆蓋率96%以上,答案由多位專業資深講師原版破解得出,正確率100%,只要您使用本站的題庫參加 IBM System p5 Virtualization Technical Support 考試,我們保證您壹次輕松通過考試;

2、售後服務第壹!我們相信要想在當今時代取得成功,必須為廣大用戶提供全套的周到細致的全程優質售後服務,只有客戶滿意了,我們才能發展。

3、我們實行“壹次不過全額退款”承諾。如果您購買我們的考題,只要不是首次通過,憑蓋有PROMETRICVUE考試中心鋼印的考試成績單,我們將退還您購買 000-062 考題的全部費用,絕對保證您的利益不受到任何的損失;

4、IBM System p5 Virtualization Technical Support 題庫根據廠家考試的變化動態更新,在廠家考題每次發生變化後,我們承諾2天內更新 IBM System p5 Virtualization Technical Support 題庫。確保 IBM System p5 Virtualization Technical Support 考題的覆蓋率始終都在96%以上。

000-062:點擊下載 000-062 考試題庫預覽部分(PDF格式)

000-062題庫預覽(DEMO)

1. Which feature of the IBM p5 servers enables customers to be confident that data within two distinct partitions on the server will be isolated?
A. POWER Hypervisor
B. Virtual LAN
C. POWER5 processor
D. Redundant Power and Cooling
Answer: A

2. A customer has a two-way p5-520 that will be running three shared processor Micro-Partitions consuming 60 percent of system resources. Immediately prior to shipment, the customer discovered they need to run a fourth server that requires AIX 5L V5.2. Which of the following will satisfy this requirement?
A. Change to a 4-way p5-550
B. Use Capacity on Demand
C. Configure a fourth logical partition
D. Add memory to the configuration
Answer: A

3. A client partition has the rootvg disks mapped from two separate VIO servers. They are using AIX mirroring to provide redundancy on rootvg. One of the VIO servers was taken down for maintenance and is now back on-line. The client partitions now show Physical Partition Marked Stale in the errpt. Which of the following will most likely resolve the problem?
A. Run cfgmgr to re-scan the devices.
B. Run mkvdev on the VIO server to re-create the devices and re-mirror rootvg.
C. Run varyonvg rootvg to refresh the volume group.
D. Run syncvg on the rootvg to synchronize rootvg.
Answer: C

4. Which of the following is an advantage of using virtualization to consolidate servers?
A. Reduced power and space requirements
B. Saves money on software costs
C. Maintenance is easier because there is only one server
D. Fewer instances of the operating system to maintain
Answer: A

5. A small organization is purchasing a POWER5 to consolidate four applications. Currently, each application has two Host Bus Adapters (HBA) connected to an Enterprise Storage Server (ESS). The customer is concerned about the cost of purchasing eight new HBAs. Which feature of virtualization will be most beneficial to this organization?
A. Virtual Ethernet
B. Micro-Partitioning
C. Virtual I/O Server
D. Capped and uncapped partitions
Answer: C

6. A customer wants to build two Dynamic Logical Partitions (DLPAR) on a p5-520. They have a requirement for communication between the two DLPARs. Which feature of virtualization will satisfy this requirement?
A. VLAN
B. Virtual Ethernet
C. Virtual I/O Server Support
D. Capped and Uncapped Partitions
Answer: B

7. A customer wants to change the resource allocation for their AIX 5L V5.3 micro LPAR system. What is the smallest processor allocation than can be moved between partitions? A. A full processor
B. 1% of a processor
C. 10% of a processor
D. 25% of a processor
Answer: B

8. A customer has four pSeries servers in their data center and wants to deploy multiple Micro-Partitions. Which of the following data center servers can be used for this purpose? A. p5-520 running Virtual I/O Server
B. p690 running AIX 5L V5.3
C. p5-510 running AIX 5L V5.2
D. p5-520 running two dedicated processor partitions
Answer: A

9. A customer has a 2 processor license for SLES 9 and a 2 processor license for AIX V5.3. Which of the following LPAR configurations is valid on a 4-way p5-550?
A. SLES9: 2 dedicated processors AIX: 2.0 processing units, 4 virtual processors, uncapped
B. SLES9: 2.0 processing units, 2 virtual processors, uncapped AIX: 2.0 processing units, 4 virtual processors, capped
C. SLES9: 2.0 processing units, 3 virtual processors, uncapped AIX: 2 dedicated processors
D. SLES9: 2.5 processing units, 3 virtual processors, capped AIX: 1.5 processing units, 2 virtual processors, capped
Answer: B

10. Which feature allows multiple partitions to share access to the network through the same physical adapter?
A. VLAN
B. EtherChannel
C. Virtual I/O Server
D. IP address aliasing
Answer: C

11. A system administrator is deploying a new POWER5 server. The application requires AIX 5L V5.2. Which of the following virtualization technologies can be used?
A. DLPAR
B. Micro-Partitioning
C. Virtual Storage
D. Virtual Ethernet
Answer: A

12. A technical specialist has a requirement to implement a 4-way POWER5 server with a small Web server partition and a high performance database server partition. The Web server provides a client front-end to the database server. The most important concerns are speed of communication between the Web server and the database and I/O speed of the database. Which of the following virtualization features would be most appropriate?
A. Virtual SCSI
B. Virtual Ethernet
C. Virtual I/O Server
D. Micro-Partitioning
Answer: B

13. A customer has a pSeries p5-520 2-way server running AIX 5L V5.3 with APV. The p5-520 is 75% utilized. The system administrator receives a request to install a new Web server for a small department. Which of the following is the best fit to deploy the new Web server?
A. Create a dedicated LPAR for the existing workload and a Micro-Partition for the Web server.
B. Create a dedicated LPAR for the existing workload and a dedicated LPAR for the Web server.
C. Create a Micro-Partition for the existing workload and a dedicated LPAR for the Web server.
D. Create a Micro-Partition for the existing workload and a Micro-Partition for the Web server.
Answer: D

14. A system administrator has a pSeries p5-520 2-way with AIX 5L V5.2 with a peak utilization of 50%. There is a request to add a new Web server for a small department. Which of the following solutions is the best fit for this environment?
A. Create a dedicated LPAR for the existing workload and a Micro-Partition for the Web server.
B. Create a dedicated LPAR for the existing workload and a dedicated LPAR for the Web server.
C. Create a Micro-Partition for the existing workload and a dedicated LPAR for the Web server.
D. Create a Micro-Partition for the existing workload and a Micro-Partition for the Web server.
Answer: B

15. Which of the following functions is provided by the LPAR Validation Tool (LVT)?
A. LPAR creation
B. Proper card placement
C. Application compatibility assistance
D. Response time for applications
Answer: B

16. When doing capacity planning for the Virtual I/O Server, what is the most important consideration?
A. The I/O workload needs of the client LPARs
B. The processing requirements of the client LPARs
C. The memory requirements of the client LPARs
D. The virtual Ethernet requirements between client LPARs
Answer: A

17. The Information Technology (IT) department wants to consolidate two 4-way p5-550 servers onto an 8-way p5-570. However, the departments using the p5-550 servers are concerned about quality of service after consolidation. Which per-partition processor allocation would provide comparable performance while still allowing the POWER5 hypervisor to optimize the processing workload of the server?
A. 4.0 processing units, 4 virtual processors, capped mode
B. 4.0 processing units, 4 virtual processors, uncapped mode
C. 4.0 processing units, 8 virtual processors, capped mode
D. 4.0 processing units, 8 virtual processors, uncapped mode
Answer: D

18. A customer wants to put two Micro-Partitions on a p5-570 and attach to a SAN. What is the best LPAR configuration to maximize SAN availability using four Host Bus Adapters (HBAs)?
A. Two HBAs assigned to each redundant VIOS which provides VSCSI access to LUNs
B. Two HBAs assigned to each LPAR with each LPAR owning HBAs on the same PCI busses
C. Two HBAs assigned to each LPAR with each LPAR owning HBAs on separate PCI busses
D. One HBA assigned to each LPAR and two HBAs assigned to a VIOS providing VSCSI access to LUNs
Answer: A

19. A hosting company recently purchased an IBM p5-570 to use in their data center. The company intends to use the server to run several different client workloads. Which of the following features of the IBM p5 servers addresses the need for the isolation of workloads? A. Workload Manager
B. Support for AIX 5.3
C. Logical partitioning
D. 64-bit or 32-bit kernel support
Answer: C

20. A customer has a database application and a Web server application running on the same p5-570 server in a single partition. Recently there have been a number of instances where the increased load on the database server has impacted the performance of the Web server. What can the technical specialist recommend to keep the database application from impacting the performance of the Web server?
A. Create a VLAN between the web server and database server.
B. Purchase APV and install the VIOS.
C. Increase the priority of the Web server.
D. Create separate LPARs for Web and database workloads.
Answer: D

21. A customer is adding a new I/O drawer to an existing p5-570 with four LPARs and wants to re-balance the network cards in the I/O drawers. What is the best way to accomplish this?
A. Add the devices as virtual adapters to a VIO server first, then add the I/O drawer and create the Shared Ethernet Adapters.
B. Power down the partitions, run the diag -a command when the system is brought back up and reconfigure the network cards.
C. Use the rmdev command to remove the devices, shut down the partitions and move the cads, then run the cfgmgr command after reboot.
D. Detach the network cards, run rmdev on the devices and then dynamically reassign the adapters to the partitions and reconfigure.
Answer: D

22. A customer wants to reassign a host bus adapter (HBA) from one partition to another to handle increased I/O workload on that partition. What needs to be done to dynamically move the card?
A. Use the rmdev command to remove the card from the current partition before doing the DLPAR process.
B. Take the source partition down and do the DLPAR function on the target partition.
C. Assign the card to the required section of the target partition and run cfgmgr.
D. Dynamically remove the card from the source and add to target profile then reactivate the target profile.
Answer: A

23. A resource was dynamically assigned to an LPAR. The customer wants to make the assignment permanent. What does the technical specialist need to do to reconfigure the LPARs to make the assignment permanent?
A. Reboot the source LPAR.
B. Remove the resource from the source LPAR.
C. Rediscover the managed system from the HMC.
D. Add the resource to the profile of the LPAR.
Answer: D

24. A customer is ordering a new p5-570 and planning for the option of using Capacity on Demand to activate additional resources in the future. Which of the following is a prerequisite to support the addition of CPUs or memory without an outage?
A. Use Micro-Partitioning
B. Configure a Virtual I/O Server
C. Configure dynamic logical partitions
D. Activate Advanced POWER Virtualization
Answer: C

25. Which of the following steps should be done FIRST when deploying a Virtual I/O server on a p5-550, which will host three logical partitions: a NIM server and two application servers?
A. Create and install the NIM server
B. Create and install the Virtual I/O Server
C. Create and install the application servers
D. Activate Advanced POWER Virtualization
Answer: D

26. Which of the following should be done FIRST when setting up a new p5-520 to be managed by a new HMC via a private network?
A. Change passwords in ASMI.
B. Add the managed system to the HMC.
C. Connect the p5-520 to a power source.
D. Connect the HMC and the p5-520 server's HMC1 port to the same network.
Answer: D

27. When planning for a logically partitioned system, which of the following should be used as part of a review to ensure that each partition has the required resources?
A. Use the Workload Estimator capacity planning tool.
B. Use prtconf output from legacy systems.
C. Use the LPAR Validation Tool.
D. Use Performance Management Services.
Answer: C

28. A customer has a single pSeries server with two shared processor logical partitions. The first partition has peak resource requirements during weekdays. The second partition has peak resource requirements during weekends. During the peak times, the total workload between the partitions does NOT exceed the capacity of the server. However, the partitions are not able to utilize the full capacity of the system during peak times, because the necessary CPU and memory resources are not always allocated to the busiest partition. Which of the following options would best balance these resources?
A. Configure AIX Workload Manager
B. Configure Partition Load Manager
C. Configure eServer Workload Manager
D. Use DLPAR from the HMC
Answer: B

29. A customer would like to have the processor resources on their system efficiently shared between logical partitions, but does not require management of memory or I/O resources. Which of the following would accomplish this requirement?
A. HMC command line
B. Uncapped processors
C. Partition Load Manager
D. Enterprise Workload Manager
Answer: B

30. A customer has two POWER5 servers. They want the two servers' virtual Ethernets to appear on the same IP subnet. Which of the following will connect the client virtual Ethernet adapters to the physical Ethernet switch connecting the two servers?
A. Configure a Shared Ethernet Adapter on the Virtual I/O Server.
B. Use the same virtual LAN ID on each LPAR.
C. Set up IP routing through an LPAR on each system.
D. Set up an IP firewall through an LPAR on each system.
Answer: A

題庫分類
廠商: Cisco, Oracle, IBM, SUN, HP, Citrix, CIW, VMWare
CISCO: CCNA, CCNP  MICROSOFT: MCSE2003, MCTS  ORACLE: OCA  JAVA: SCJP  VMWare: VCP-310  
如何購買      關於我們      FAQs